6. Test Planning Process

  1. Pre-Planning Activities
    1. Success Criteria/Acceptance Criteria - The criteria that must be validated through testing to provide user management with the information needed to make an acceptance decision.
    2. Test Objectives - Objectives to be accomplished through testing.
    3. Assumptions - Establishing those conditions that must exist for testing to be comprehensive and on schedule; for example, software must be available for testing on a given date, hardware configurations available for testing must include XYZ, etc.
    4. Entrance Criteria/Exit Criteria - The criteria that must be met prior to moving to the next level of testing, or into production.
  2. Test Planning
    1. Test Plan - The deliverables to meet the test’s objectives; the activities to produce the test deliverables; and the schedule and resources to complete the activities.
    2. Requirements/Traceability - Defines the tests needed and relates those tests to the requirements to be validated.
    3. Estimating - Determines the amount of resources required to accomplish the planned activities.
    4. Scheduling - Establishes milestones for completing the testing effort.
    5. Staffing - Selecting the size and competency of staff needed to achieve the test plan objectives.
    6. Approach - Methods, tools, and techniques used to accomplish test objectives.
    7. Test Check Procedures (i.e., test quality control) - Set of procedures based on the test plan and test design, incorporating test cases that ensure that tests are performed correctly and completely.
  3. Post-Planning Activities
    1. Change Management - Modifies and controls the plan in relationship to actual progress and scope of the system development.
    2. Versioning (change control/change management/configuration management) - Methods to control, monitor, and achieve change.

User login

CAPTCHA
This question is for testing whether you are a human visitor and to prevent automated spam submissions.
3 + 1 =
Solve this simple math problem and enter the result. E.g. for 1+3, enter 4.
To prevent automated spam submissions leave this field empty.

RSS / XML Feeds